Alinta Energy Port Hedland Power Station

Global Testing Services were engaged to carry out engineering support, procurement and supply of equipment, inspection, testing, commissioning and handover for the design of a digitally enhanced protection scheme for two 66kV transmission lines

66kV Line Protection Upgrade

Alinta Energy Port Hedland Power Station

Commencement: June 2018

Completion: July 2018

Type of Contract: Lump Sum

Contract Value: $1, 350,000
Scope of Work 

Global Testing Services were engaged to carry out engineering support, procurement and supply of equipment, inspection, testing, commissioning and handover for the design of a digitally enhanced protection scheme for two 66kV transmission lines which run from Alinta Energy’s PHPS switchyard to Horizon Power’s Wedgefield and Murdoch Drive substations.

Project Challenges 

A number of challenges were encountered with the works on this project. These ranged from an extremely tight time frame, to delays with access, design issues and fractious relationships between the client and the network operator. Also, this period proved to be very busy for GTS so there were internal pressures around resources. None of these challenges delayed the project with final commissioning being completed on time.

Clients comments

“I would like to thank and congratulate GTS on the efforts for the safe and reliable energisation of the line this evening. Greg and Steve provided full competency for the testing conducted in very challenging situations. I appreciate the efforts and patience in this process.”
 
“This has been a combined effort with Henry, Gary S, Gary T and Wayne carrying out much of the installation works. Steve Turner and Greg Godfrey were terrific in driving this to the end with the target date met. It cannot be overstated the sheer quantity of roadblocks, hurdles and hoops that were negotiated to achieve this exceptional result.”



Zero Harm

All works were conducted without safety or environmental incident.

Accreditations & Policies


 


Global Testing Services


Our team members travel all over Australia and the world, going to countries such as Malaysia, India, Vietnam, Egypt and throughout the Asia Pacific.

We take great pleasure in ensuring our clients get the specialised service they have come to expect from Global Testing Services.






 

Head Office
Perth
36 Bannick Court Canning Vale
WA 6155
Australia
 
Phone
+61 (08) 9456 7700
After hours
+61 400 040 010
Transformer Branch
Bunbury
21 Gibbons Road Davenport 
WA 6230
Australia
 
Phone
+61 (08) 9725 4583
After hours
+61 428 648 848
Pilbara Branch
Newman
Equal Certification does not cover our Newman operation
1/85 Welsh Drive
Newman
WA 6753
Australia
 
Phone
+61 (08) 9175 0177
After hours
+61 447 189 995

Request a call back

If you’d like to find out more about our services, or how we can work with you, please fill in the Request a Call Back and one of our team will get back to you within 24 hours.

COPYRIGHT © Global Testing Services 2024. 
All Rights Reserved

Site by: Hyperactive Digital